← The Yakima Wire
Development

Culvert Replacement Project Filed

πŸ”Š Listen Β· narrated by Aiden

Yakima County filed a SEPA document (202603209) on July 30, 2026, for a culvert replacement project on a Type 3 stream. The project, proposed by Robert Guimaraes, involves replacing an existing culvert with a 100-foot-long one. Public comments are due by August 13, 2026. The project is part of routine infrastructure maintenance in Yakima County. A Type 3 stream is a waterway that supports fish and wildlife. The SEPA process ensures environmental review before construction begins. Residents can submit comments through the county's public records system. The county will review public comments before proceeding with the project. The timeline for construction is not specified in the SEPA document.

πŸ“„ Source: WA Ecology SEPA β€” Yakima County β€” https://data.wa.gov/resource/mmcb-z6jf.json?countyname=YAKIMA
Source receipts3 of 10 claims supported Β· 30%

Legacy automated check: the original source text was not preserved. These earlier verdicts have not passed the current publication checks and may contain errors. Source: original document β†—

  • ⚠
    Yakima County filed a SEPA document (202603209) on July 30, 2026No usable supporting receipt β€” unverified.
  • βœ“
    The SEPA document is for a culvert replacement project on a Type 3 streamβ€œDescription: The proposal is to replace an existing culvert with a 100' long culvert within a Type 3 stream.”
  • βœ“
    The project, proposed by Robert Guimaraes, involves replacing an existing culvert with a 100-foot-long oneβ€œDescription: The proposal is to replace an existing culvert with a 100' long culvert within a Type 3 stream.”
  • βœ“
    Public comments are due by August 13, 2026β€œComments due: 2026-08-13”
  • ⚠
    The project is part of routine infrastructure maintenance in Yakima CountyNo usable supporting receipt β€” unverified.
  • ⚠
    A Type 3 stream is a waterway that supports fish and wildlifeNo usable supporting receipt β€” unverified.
  • ⚠
    The SEPA process ensures environmental review before construction beginsNo usable supporting receipt β€” unverified.
  • ⚠
    Residents can submit comments through the county's public records systemNo usable supporting receipt β€” unverified.
  • ⚠
    The county will review public comments before proceeding with the projectNo usable supporting receipt β€” unverified.
  • ⚠
    The timeline for construction is not specified in the SEPA documentNo usable supporting receipt β€” unverified.

The Yakima Wire is free. Get Yakima's news delivered every morning.